Side walls are 9" thick concrete, with the floor 12" thick.
A vapor barrier is fitted to the outside surfaces, and a seamless waterstop gasket was installed
into the joint between the walls and floor.
All interior surfaces will have a chemical-resistant coating.
A knee wall separates the alkaline and acid sides of the pit.